Grant Wizard

Guide, Scope of Work & Specifications

Back to report

These documents are built from the same rules the report uses — page names, section list, Workday columns, thresholds and the salary cap — so they change whenever the app changes.

1. Get started

2. Pages

The report has separate pages, ending with a dedicated Next Steps page. Primary tables start open; secondary reviews start collapsed. Shaded section headings and accent rules separate each section. Section details and guidance stay under Details & guidance. Use the tabs at the top, or tick All sections for one long page. Expand all and Collapse all are always visible beside the page tabs and control report section disclosures across all pages. Table sizing remains under Display settings. New reports, Guided setup, instructions, Excel and PDF are under Report tools; the side file panel still offers downloads. The setup checklist lives on Data & Setup. Monthly Expenses keeps its period totals visible while date editing, reset, sizing and bulk controls are under Budget period dates & settings. Undo, redo, setup and page arrows sit below the report rather than floating over its figures.

Optional tools & award resources

Use Add tools at the top to select any combination of Salary Cap Calculator, Person Months Calculator, RPPR & FFR Participant Effort, and Subrecipient Expenses. The three personnel tools start hidden. Subrecipient Expenses appears automatically when subaward budget or actual costs are present in Budget vs Actuals, yearly budgets, or Details View; you can also select it without costs or uncheck it to hide it. In the Person Months Calculator you can type any appointment base in months (for example 5) or pick a common one.

Selections are saved for each report in this browser and included in backups and undo/redo. Hiding a tool does not delete its entries or change calculations. Only selected tools appear in the section navigation and PDF / Print choices; Excel keeps its existing report content. Award resources at the top opens the federal resource links and UAMS Grants Portal in a separate window within the app, without taking space in the report.

Summary & Balances

  • Balance at a Glance
  • Status at a Glance
  • What Amounts Mean
  • Summary
  • ↳ Planned Costs (manual)
  • ↳ Re-Budget Check
  • ↳ Revised Budget
  • ↳ Direct / Indirect Balances

Personnel & Effort

  • Personnel & Effort
  • ↳ Effort Allocations Table
  • ↳ Salary Cap Calculator
  • ↳ Person Months Calculator
  • RPPR / FFR Effort

Monthly Expenses

  • Monthly Expenses

Indirect & Subawards

  • Subrecipients
  • Indirect & Exemptions
  • ↳ Indirect Cost Check
  • ↳ Exempt Transfer Tool
  • Budget Redistribution

Data & Setup

  • Reporting Details
  • Workday Data
  • ↳ Budget vs Actuals
  • ↳ Actual Expenses (Details View)
  • ↳ Effort Allocations
  • Save & Restore

Next Steps

  • Next Steps
  • Rebudgeting guidance

3. Re-budgeting quickly

On Indirect & Subawards, Budget Redistribution follows Indirect Costs and Exemptions, so the F&A review appears before the redistribution plan.

Before rebudgeting: calculate F&A first now lives on Next Steps under the initially collapsed Rebudgeting guidance & approval review section. It contains the current F&A warnings, suggested planning order and federal sources without competing with the Summary table or expanding the one-page Next Steps printout.

Monthly budgets from a Notice of Award

Choose Upload NOA at the top of any report page, beside Award resources, or Import Notice of Award inside Monthly Expenses. Choose one notice or several at once (for example each year's NOA plus revisions); each text-based PDF or text file is read on your device and matched to its own budget period, and all lines are reviewed together, labeled by file name. You can also paste a notice's budget table. Later notices can be added any time: periods not in a notice stay unchanged, and you choose to replace or add to matched cells. Review the detected dates, confirm each budget period and match each dollar amount to a cost category. Use Unmatched only, search (including by file name), or Assign shown lines to period to finish without scrolling through the report. Exclude totals, duplicates and non-budget amounts; add missing category lines manually. Scanned PDFs and notices that provide only totals cannot supply category-level budgets automatically.

Confirm the award and included amounts before applying. Replacing changes only matched period/category cells and preserves other budgets; adding increases those cells. Multiple included lines for the same period/category are summed. Summary budgets, actual expenses and award dates are not changed. Use Undo or a backup to restore previous entries. The original notice is not saved or uploaded anywhere.

Auto restores that period's dates from the project start (or award start/current budget-period start if no project start is entered), even after resetting dates. It does not fill budget dollars. Extensions require the award end to extend beyond the preceding period; the app explains when dates cannot be generated.

Calculate F&A before finalizing transfers

The Re-Budget Totals section includes a compact, live MTDC (Modified Total Direct Costs) calculation. It shows the revised total budget, exclusions, MTDC = (total budget − exclusions) ÷ (1 + F&A rate), calculated F&A = MTDC × rate, and the remaining adjustment = calculated F&A − revised F&A budget. It holds the revised total budget fixed and updates with Re-Budget entries; exemptions use revised fully exempt budgets and posted subaward amounts above the per-recipient threshold, so future subaward plans still need review.

  1. Confirm the Notice of Award, sponsor restrictions, applicable F&A rate and base, subaward threshold, and expected costs with Grants Accounting.
  2. Calculate F&A redistribution before choosing transfer amounts. For moves between exempt and non-exempt costs, split the available dollars between direct costs and F&A; do not allocate the entire exempt amount to non-exempt spending.
  3. Review the proposed split with the PI, Grants Accounting and the Sponsor before processing it. Obtain Grants Accounting clearance and the Sponsor's prior written approval when required by the award or federal rules.
  4. Enter the approved proposed direct-category changes and matching F&A change together. Recalculate F&A whenever the exempt base changes; the rate itself does not change.
  5. Then check that net Re-Budget is $0.00, F&A adjustment remaining is $0.00, and projected shortfalls are resolved. Document the reasons and PI actions; Grants Accounting processes approved changes in official records.

Exempt-to-non-exempt changes are flagged for approval review with Grants Accounting and the Sponsor both before the move and in the PI summary. Obtain Grants Accounting clearance and the Sponsor's prior written approval when required by the award or applicable rules. None of these actions grants approval.

This is a recommended planning sequence, not a federally prescribed button order. Grants Accounting clearance is an institutional workflow, not a blanket federal approval rule. A balanced calculation is not approval; award terms and agency rules control.

Federal review: a scope/objective change requires prior approval even without a budget change. Under 2 CFR 200.308(i), an agency may restrict cumulative direct-category transfers above 10% of the last approved total budget (including cost share) when the federal share exceeds the simplified acquisition threshold; this is not an automatic approval rule for every award. NIH significant rebudgeting uses a single-category deviation greater than 25% of total costs awarded as a possible scope-change indicator, not an aggregate-transfer safe harbor. Confirm the applicable award terms with Grants Accounting.

4. Personnel projections

5. Meetings & printing

© 2026 Anna Evatt and University of Arkansas for Medical Sciences (UAMS). All rights reserved.